top of page

Engineer Training and Evaluation Outline

Browse publicly releasable Training & Evaluation Outlines aligned with current Army standards.

Public (Restriction A) T&EOs — Hyperlinked

These T&EOs are marked “Distribution: Approved for public release; distribution is unlimited.” Because they are unrestricted and publicly available through official Army sources, this site provides direct links to them for convenience.

These are safe for public access and do not contain controlled, sensitive, or limited-distribution content.

05-1-0015 - Fight as Infantry

05-1-0045 - Control Airfield Damage Repair (ADR) Operations

05-1-0045 - Control Airfield Damage Repair (ADR) Operations

05-1-0716 - Prepare a Construction Estimate

05-1-0719 - Perform Quality Control Operations

05-1-5000 - Plan General Engineering Support Missions

05-1-5000 - Plan General Engineering Support Missions

05-1-6001 - Request a Standard Geospatial Product

05-3-1006 - Construct a Medium Girder Bridge (MGB) with a Link Reinforcement System (LRS)

05-3-5100 - Place Airfield Matting on Prepared Surfaces

05-3-5101 - Construct Combat Roads/Trails

05-3-5102 - Construct Roads

05-3-5102 - Construct Roads

05-3-5108 - Perform Clearing, Grubbing, and Stripping Operations

05-3-5118 - Maintain Existing Roads

05-3-5120 - Produce Asphaltic Concrete

05-3-5143 - Construct a Helipad

05-3-5200 - Construct a Nonstandard Fixed Bridge

05-3-5200 - Construct a Nonstandard Fixed Bridge

05-3-5202 - Reinforce a Existing Bridge

05-3-5211 - Construct a Water Distribution System

05-3-5212 - Construct Electrical Utilities

05-3-5220 - Construct a Wood Frame Structure

05-3-5222 - Construct a Steel-Frame Pre-engineered Structure

05-3-5223 - Construct a Concrete Structure

05-3-5300 - Construct Expedient Coupled Pipeline Supports

05-3-5302 - Excavate a Pipeline Trench

05-3-5305 - Install Underground Pipeline Crossing Site

05-3-5306 - Install Pipeline Pumping Stations

05-3-5308 - Test Pipeline System

05-3-5310 - Prepare Pipeline Route Profile

05-3-5412 - Exercise Mission Command Over Firefighting Teams

05-3-5700 - Install Nonstandard Low-Voltage, Electrical-Power Distribution Equipment

05-3-5700 - Install Nonstandard Low-Voltage, Electrical-Power Distribution Equipment

05-3-5715 - Perform Power Plant Design Technical Assistance

05-3-5723 - Install Prime Power Generation Equipment

05-3-5728 - Assess Power Generation Systems for Damage

05-3-5802 - Construct Onshore Mooring Anchors

05-3-5803 - Construct a Landing Craft Ramp

05-6-0080 - Recommend the Employment Priority of Engineer Assets

05-6-0082 - Plan Engineer Support for Real Property Maintenance

05-6-0084 - Coordinate Engineer Support with the Host Nation (HN)/Coalition Representative

05-6-0715 - Coordinate Construction Operations

05-6-0812 - Plan Equipment Support Missions

05-6-1002 - Plan Combat Roads or Trails

05-6-1002 - Plan Combat Roads or Trails

05-8-0076 - Manage Contingency Engineering

05-8-0076 - Manage Contingency Engineering


Power in Numbers

30

Programs

50

Locations

200

Volunteers

Project Gallery

bottom of page